30 Days of Knitting: Day 2
As Becca's present's currently sitting in Oz land (and no one else of concern reads this blog) I feel safe answering this question. I have a couple of Christmas presents currently in the works.
I have a GSP cozy (textured stitch, with felt owl for the front), a cabled hat (based off this) and ribbed hat (rav link) currently in production. The cozy's almost done. The side needs to be seamed up on it (yes I knit it flat...I didn't have my circs handy *headdesk*). The cabled hat's halfway done and the ribbed hat's just started. Unfortunately I only have the ribbed hat with me to take photos. No worries though I've made up for it by using one of my favorite books as a backdrop.
The cable in the photo's because I'm using the magic loop method (best thing ever!)...
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment